Construction Regulations, 2014
491 rows
| Verified | Citation | Number | Subs | Para | Subpara | Item | Role | Text |
|---|---|---|---|---|---|---|---|---|
| – | Construction Regulations 13(2)(b)(ii) | 13 | (2) | (b) | (ii) | proviso | Provided that— | |
| – | Construction Regulations 13(2)(b)(ii)(aa) | 13 | (2) | (b) | (ii) | (aa) | entry | permission has been given in writing by the appointed competent person contemplated in subregulation (1) upon evaluation by him or her of the site conditions; and |
| – | Construction Regulations 13(2)(b)(ii)(bb) | 13 | (2) | (b) | (ii) | (bb) | entry | where any uncertainty pertaining to the stability of the soil still exists, the decision from a professional engineer or a professional technologist competent in excavations is decisive and such a decision must be noted in writing and signed by both the competent person contemplated in subregulation (1) and the professional engineer or technologist, as the case may be; |
| – | Construction Regulations 13(2)(c) | 13 | (2) | (c) | entry | must take steps to ensure that the shoring or bracing contemplated in paragraph (b) is designed and constructed in a manner that renders it strong enough to support the sides of the excavation in question; | ||
| – | Construction Regulations 13(2)(d) | 13 | (2) | (d) | entry | must ensure that no load, material, plant or equipment is placed or moved near the edge of any excavation where it may cause its collapse and consequently endangers the safety of any person, unless precautions such as the provision of sufficient and suitable shoring or bracing are taken to prevent the sides from collapsing; | ||
| – | Construction Regulations 13(2)(e) | 13 | (2) | (e) | entry | must ensure that where the stability of an adjoining building, structure or road is likely to be affected by the making of an excavation, steps are taken to ensure the stability of such building, structure or road and the safety of persons; | ||
| – | Construction Regulations 13(2)(f) | 13 | (2) | (f) | entry | must cause convenient and safe means of access to be provided to every excavation in which persons are required to work, and such access may not be further than six meters from the point where any worker within the excavation is working; | ||
| – | Construction Regulations 13(2)(g) | 13 | (2) | (g) | entry | must ascertain, as far as is reasonably practicable, the location and nature of electricity, water, gas or other similar services which may in any way be affected by the work to be performed, and must before the commencement of excavation work that may affect any such service, take the steps that are necessary to render the circumstances safe for all persons involved; | ||
| – | Construction Regulations 13(2)(h) | 13 | (2) | (h) | opening | must ensure that every excavation, including all bracing and shoring, is inspected— | ||
| – | Construction Regulations 13(2)(h)(i) | 13 | (2) | (h) | (i) | entry | daily, prior to the commencement of each shift; | |
| – | Construction Regulations 13(2)(h)(ii) | 13 | (2) | (h) | (ii) | entry | after every blasting operation; | |
| – | Construction Regulations 13(2)(h)(iii) | 13 | (2) | (h) | (iii) | entry | after an unexpected fall of ground; | |
| – | Construction Regulations 13(2)(h)(iv) | 13 | (2) | (h) | (iv) | entry | after damage to supports; and | |
| – | Construction Regulations 13(2)(h)(v) | 13 | (2) | (h) | (v) | entry | after rain, | |
| – | Construction Regulations 13(2)(h) | 13 | (2) | (h) | closing | by the competent person contemplated in subregulation (1), in order to ensure the safety of the excavation and of persons, and those results must be recorded in a register kept on site and made available on request to an inspector, the client, the client’s agent, any other contractor or any employee; | ||
| – | Construction Regulations 13(2)(i) | 13 | (2) | (i) | opening | must cause every excavation which is accessible to the public or which is adjacent to public roads or thoroughfares, or whereby the safety of persons may be endangered, to be— | ||
| – | Construction Regulations 13(2)(i)(i) | 13 | (2) | (i) | (i) | entry | adequately protected by a barrier or fence of at least one metre in height and as close to the excavation as is practicable; and | |
| – | Construction Regulations 13(2)(i)(ii) | 13 | (2) | (i) | (ii) | entry | provided with warning illuminants or any other clearly visible boundary indicators at night or when visibility is poor, or have resort to any other suitable and sufficient precautionary measure where subparagraphs (i) and (ii) are not practicable; | |
| – | Construction Regulations 13(2)(j) | 13 | (2) | (j) | entry | must ensure that all precautionary measures stipulated for confined spaces as determined in the General Safety Regulations, 2003, are complied with by any person entering any excavation; | ||
| – | Construction Regulations 13(2)(k) | 13 | (2) | (k) | entry | must, where the excavation work involves the use of explosives, appoint a competent person in the use of explosives for excavation, and must ensure that a method statement is developed by that person in accordance with the applicable explosives legislation; and | ||
| – | Construction Regulations 13(2)(l) | 13 | (2) | (l) | entry | must cause warning signs to be positioned next to an excavation within which or where persons are working or carrying out inspections or tests. | ||
| – | Construction Regulations 14(1) | 14 | (1) | entry | A contractor must appoint a competent person in writing to supervise and control all demolition work on site. | |||
| – | Construction Regulations 14(2) | 14 | (2) | entry | A contractor must ensure that before any demolition work is carried out, and in order to ascertain the method of demolition to be used, a detailed structural engineering survey of the structure to be demolished is carried out by a competent person and that a method statement on the procedure to be followed in demolishing the structure is developed by that person. | |||
| – | Construction Regulations 14(3) | 14 | (3) | entry | During a demolition, the competent person contemplated in subregulation (1) must check the structural integrity of the structure at intervals determined in the method statement contemplated in subregulation (2), in order to avoid any premature collapses. | |||
| – | Construction Regulations 14(4) | 14 | (4) | opening | A contractor who performs demolition work must— | |||
| – | Construction Regulations 14(4)(a) | 14 | (4) | (a) | opening | with regard to a structure being demolished, take steps to ensure that— | ||
| – | Construction Regulations 14(4)(a)(i) | 14 | (4) | (a) | (i) | entry | no floor, roof or other part of the structure is overloaded with debris or material in a manner which would render it unsafe; | |
| – | Construction Regulations 14(4)(a)(ii) | 14 | (4) | (a) | (ii) | entry | all reasonably practicable precautions are taken to avoid the danger of the structure collapsing when any part of the framing of a framed or partly framed building is removed, or when reinforced concrete is cut; and | |
| – | Construction Regulations 14(4)(a)(iii) | 14 | (4) | (a) | (iii) | entry | precautions are taken in the form of adequate shoring or other means that may be necessary to prevent the accidental collapse of any part of the structure or adjoining structure; | |
| – | Construction Regulations 14(4)(b) | 14 | (4) | (b) | entry | ensure that no person works under overhanging material or a structure which has not been adequately supported, shored or braced; | ||
| – | Construction Regulations 14(4)(c) | 14 | (4) | (c) | entry | ensure that any support, shoring or bracing contemplated in paragraph (b), is designed and constructed so that it is strong enough to support the overhanging material; | ||
| – | Construction Regulations 14(4)(d) | 14 | (4) | (d) | entry | where the stability of an adjoining building, structure or road is likely to be affected by demolition work on a structure, take steps to ensure the stability of such structure or road and the safety of persons; | ||
| – | Construction Regulations 14(4)(e) | 14 | (4) | (e) | entry | ascertain as far as is reasonably practicable the location and nature of electricity, water, gas or other similar services which may in any way be affected by the work to be performed, and must before the commencement of demolition work that may affect any such service, take the steps that are necessary to render circumstances safe for all persons involved; | ||
| – | Construction Regulations 14(4)(f) | 14 | (4) | (f) | entry | cause every stairwell used and every floor where work is being performed in a building being demolished, to be adequately illuminated by either natural or artificial means; | ||
| – | Construction Regulations 14(4)(g) | 14 | (4) | (g) | entry | cause convenient and safe means of access to be provided to every part of the demolition site in which persons are required to work; and | ||
| – | Construction Regulations 14(4)(h) | 14 | (4) | (h) | entry | erect a catch platform or net above an entrance or passageway or above a place where persons work or pass under, or fence off the danger area if work is being performed above such entrance, passageway, or place so as to ensure that all persons are kept safe where there is a danger or possibility of persons being struck by falling objects. | ||
| – | Construction Regulations 14(5) | 14 | (5) | entry | A contractor must ensure that no material is dropped to any point, which falls outside the exterior walls of the structure, unless the area is effectively protected. | |||
| – | Construction Regulations 14(6) | 14 | (6) | opening | No person may dispose of waste and debris from a high place by a chute unless the chute— | |||
| – | Construction Regulations 14(6)(a) | 14 | (6) | (a) | entry | is adequately constructed and rigidly fastened; | ||
| – | Construction Regulations 14(6)(b) | 14 | (6) | (b) | entry | if inclined at an angle of more than 45 degrees to the horizontal, is enclosed on its four sides; | ||
| – | Construction Regulations 14(6)(c) | 14 | (6) | (c) | entry | if of the open type, is inclined at an angle of less than 45 degrees to the horizontal; | ||
| – | Construction Regulations 14(6)(d) | 14 | (6) | (d) | entry | where necessary, is fitted with a gate at the bottom end to control the flow of material; and | ||
| – | Construction Regulations 14(6)(e) | 14 | (6) | (e) | entry | discharges into a container or an enclosed area surrounded by barriers. | ||
| – | Construction Regulations 14(7) | 14 | (7) | entry | A contractor must ensure that every chute used to dispose of rubble is designed in such a manner that rubble does not free-fall and that the chute is strong enough to withstand the force of the debris travelling along the chute. | |||
| – | Construction Regulations 14(8) | 14 | (8) | entry | A contractor must ensure that no equipment is used on floors or working surfaces, unless such floors or surfaces are of sufficient strength to support the imposed loads. | |||
| – | Construction Regulations 14(9) | 14 | (9) | entry | Where a risk assessment indicates the presence of asbestos, a contractor must ensure that all asbestos related work is conducted in accordance with the Asbestos Regulations, 2001, promulgated by Government Notice No. R.155 of 10 February 2002. | |||
| – | Construction Regulations 14(10) | 14 | (10) | entry | Where a risk assessment indicates the presence of lead, a contractor must ensure that all lead related work is conducted in accordance with the Lead Regulations, 2001, promulgated by Government Notice No. R.236 of 28 February 2002. | |||
| – | Construction Regulations 14(11) | 14 | (11) | entry | Where the demolition work involves the use of explosives, a method statement must be developed in accordance with the applicable explosives legislation, by an appointed person who is competent in the use of explosives for demolition work and all persons involved in the demolition works must adhere to demolition procedures issued by the appointed person. | |||
| – | Construction Regulations 14(12) | 14 | (12) | entry | A contractor must ensure that all waste and debris are as soon as reasonably practicable removed and disposed of from the site in accordance with the applicable legislation. | |||
| – | Construction Regulations 15 | 15 | entry | No person may enter a tunnel, which has a height dimension of less than 800 millimetres. | ||||
| – | Construction Regulations 16(1) | 16 | (1) | entry | A contractor must appoint a competent person in writing who must ensure that all scaffolding work operations are carried out under his or her supervision and that all scaffold erectors, team leaders and inspectors are competent to carry out their work. | |||
| – | Construction Regulations 16(2) | 16 | (2) | entry | A contractor using access scaffolding must ensure that such scaffolding, when in use, complies with the safety standards incorporated for this purpose into these Regulations under section 44 of the Act. | |||
| – | Construction Regulations 17(1) | 17 | (1) | entry | A contractor must appoint a competent person in writing who must ensure that all suspended platforms work operations are carried out under his or her supervision and that all suspended platform erectors, operators and inspectors are competent to carry out their work. | |||
| – | Construction Regulations 17(2) | 17 | (2) | opening | No contractor may use or permit the use of a suspended platform, unless— | |||
| – | Construction Regulations 17(2)(a) | 17 | (2) | (a) | entry | the design, stability and construction thereof comply with the safety standards incorporated for this purpose into these Regulations under section 44 of the Act; | ||
| – | Construction Regulations 17(2)(b) | 17 | (2) | (b) | entry | he or she is in possession of a certificate of system design issued by a professional engineer, certificated engineer or a professional technologist for the use of the suspended platform system; and | ||
| – | Construction Regulations 17(2)(c) | 17 | (2) | (c) | opening | he or she is, before the commencement of the work, in possession of an operational compliance plan developed by a competent person based on the certificate of system design contemplated in subparagraph (b) and applicable to the environment in which the system is being used, which operational compliance plan must include proof of the— | ||
| – | Construction Regulations 17(2)(c)(i) | 17 | (2) | (c) | (i) | entry | appointment of the competent person contemplated in subregulation (1); | |
| – | Construction Regulations 17(2)(c)(ii) | 17 | (2) | (c) | (ii) | entry | competency of erectors, operators and inspectors; | |
| – | Construction Regulations 17(2)(c)(iii) | 17 | (2) | (c) | (iii) | entry | operational design calculations, which must comply with the requirements of the system design certificate; | |
| – | Construction Regulations 17(2)(c)(iv) | 17 | (2) | (c) | (iv) | entry | performance test results; | |
| – | Construction Regulations 17(2)(c)(v) | 17 | (2) | (c) | (v) | entry | sketches indicating the completed system with the operational loading capacity of the platform; | |
| – | Construction Regulations 17(2)(c)(vi) | 17 | (2) | (c) | (vi) | entry | procedures for and records of inspections having been carried out; and | |
| – | Construction Regulations 17(2)(c)(vii) | 17 | (2) | (c) | (vii) | entry | procedures for and records of maintenance work having been carried out. | |
| – | Construction Regulations 17(3) | 17 | (3) | entry | A contractor making use of a suspended platform system must submit a copy of the certificate of system design contemplated in subregulation (2) (b), including a copy of the operational design calculations contemplated in subregulation 2 (c) (iii), sketches and test results, to the provincial director before commencement of the use of the system and must further indicate the intended type of work that the system will be used for. | |||
| – | Construction Regulations 17(4) | 17 | (4) | entry | A contractor must submit a copy of the certificate of system design in the manner contemplated in subregulation (3) for every new project. | |||
| – | Construction Regulations 17(5) | 17 | (5) | opening | A contractor must ensure that the outriggers of each suspended platform— | |||
| – | Construction Regulations 17(5)(a) | 17 | (5) | (a) | entry | are constructed of material of adequate strength and have a safety factor of at least four in relation to the load it is to carry; and | ||
| – | Construction Regulations 17(5)(b) | 17 | (5) | (b) | entry | have suspension points provided with stop devices or other effective devices at the outer ends to prevent the displacement of ropes. | ||
| – | Construction Regulations 17(6) | 17 | (6) | opening | A contractor must ensure that— | |||
| – | Construction Regulations 17(6)(a) | 17 | (6) | (a) | entry | the parts of the building or structure on which the outriggers of a suspended platform are supported, are checked by means of calculations to ensure that the required safety factor is adhered to without risk of damage to the building or structure; | ||
| – | Construction Regulations 17(6)(b) | 17 | (6) | (b) | entry | the suspension wire rope and the safety wire rope are separately connected to the outrigger; | ||
| – | Construction Regulations 17(6)(c) | 17 | (6) | (c) | entry | each person on a suspended platform is provided with and wears a body harness as a fall prevention device, which must at all times be attached to the suspended platform; | ||
| – | Construction Regulations 17(6)(d) | 17 | (6) | (d) | entry | the hand or power driven machinery to be used for the lifting or lowering of the working platform of a suspended platform is constructed and maintained in such a manner that an uncontrolled movement of the working platform cannot occur; | ||
| – | Construction Regulations 17(6)(e) | 17 | (6) | (e) | entry | the machinery referred to in paragraph (d) is so situated that it is easily accessible for inspection; | ||
| – | Construction Regulations 17(6)(f) | 17 | (6) | (f) | entry | the rope connections to the outriggers are vertically above the connections to the working platform; and | ||
| – | Construction Regulations 17(6)(g) | 17 | (6) | (g) | entry | when the working platform is suspended by two ropes only, the connections of the ropes to the working platform are of a height above the level of the working platform to ensure the stability of the working platform. | ||
| – | Construction Regulations 17(7) | 17 | (7) | opening | A contractor must ensure that a suspended platform— | |||
| – | Construction Regulations 17(7)(a) | 17 | (7) | (a) | entry | is suspended as near as possible to the structure to which work is being done to prevent as far as is reasonably practicable horizontal movement away from the face of the structure; | ||
| – | Construction Regulations 17(7)(b) | 17 | (7) | (b) | entry | is fitted with anchorage points to which workers must attach the lanyard of the safety harness worn and used by the worker, and such anchorage connections must have sufficient strength to withstand any potential load applied to it; and | ||
| – | Construction Regulations 17(7)(c) | 17 | (7) | (c) | opening | is fitted with a conspicuous notice easily understandable by all workers working with the suspended platform, showing— | ||
| – | Construction Regulations 17(7)(c)(i) | 17 | (7) | (c) | (i) | entry | the maximum mass load; | |
| – | Construction Regulations 17(7)(c)(ii) | 17 | (7) | (c) | (ii) | entry | the maximum number of persons; and | |
| – | Construction Regulations 17(7)(c)(iii) | 17 | (7) | (c) | (iii) | entry | the maximum total mass load, including load and persons, which the suspended platform can carry. | |
| – | Construction Regulations 17(8) | 17 | (8) | opening | A contractor must cause— | |||
| – | Construction Regulations 17(8)(a) | 17 | (8) | (a) | entry | the whole installation and all working parts of a suspended platform to be thoroughly examined by a competent person in accordance with the manufacturer’s specification; | ||
| – | Construction Regulations 17(8)(b) | 17 | (8) | (b) | entry | the whole installation to be subjected to a performance test as determined by the standard to which the suspended platform was manufactured; | ||
| – | Construction Regulations 17(8)(c) | 17 | (8) | (c) | entry | the performance test contemplated in paragraph (b) to be done by a competent person appointed in writing, with the knowledge and experience of erection and maintenance of suspended platforms or similar machinery, and who must determine the serviceability of the structures, ropes, machinery and safety devices before they are used, every time suspended platforms are erected; and | ||
| – | Construction Regulations 17(8)(d) | 17 | (8) | (d) | entry | the performance test contemplated in paragraph (b) of the whole installation of the suspended platform to be subjected to a load equal to that prescribed by the manufacturer or, in the absence of such load, to a load of 110 per cent of the rated mass load, at intervals not exceeding 12 months and in such a manner that every part of the installation is stressed accordingly. | ||
| – | Construction Regulations 17(9) | 17 | (9) | entry | A contractor must, in addition to subregulation (8), cause every hoisting rope, hook or other load-attaching device which forms part of the suspended platform to be thoroughly examined in accordance with the manufacturer’s specification by the competent person contemplated in subregulation (8) before they are used every time they are assembled, and, in cases of continuous use, at intervals not exceeding three months. | |||
| – | Construction Regulations 17(10) | 17 | (10) | opening | A contractor must ensure that the suspended platform supervisor contemplated in subregulation (1), or the suspended platform inspector contemplated in subregulation (8) (c), carries out a daily inspection of all the equipment prior to use, including establishing whether— | |||
| – | Construction Regulations 17(10)(a) | 17 | (10) | (a) | entry | all connection bolts are secure; | ||
| – | Construction Regulations 17(10)(b) | 17 | (10) | (b) | entry | all safety devices are functioning; | ||
| – | Construction Regulations 17(10)(c) | 17 | (10) | (c) | entry | all safety devices are not tampered with or vandalized; | ||
| – | Construction Regulations 17(10)(d) | 17 | (10) | (d) | entry | the total maximum mass load of the platform is not exceeded; | ||
| – | Construction Regulations 17(10)(e) | 17 | (10) | (e) | entry | the occupants in the suspended platform are using body harnesses which have been properly attached; | ||
| – | Construction Regulations 17(10)(f) | 17 | (10) | (f) | entry | there are no visible signs of damage to the equipment; and | ||
| – | Construction Regulations 17(10)(g) | 17 | (10) | (g) | entry | all reported operating problems have been attended to. | ||
| – | Construction Regulations 17(11) | 17 | (11) | entry | A contractor must ensure that all inspection and performance test records are kept on the construction site at all times and made available to an inspector, the client, the client’s agent or any employee upon request. | |||
| – | Construction Regulations 17(12) | 17 | (12) | opening | A contractor must ensure that all employees required to work or to be supported on a suspended platform are— | |||
| – | Construction Regulations 17(12)(a) | 17 | (12) | (a) | entry | medically fit to work safely in a fall risk position or such similar environment by being in possession of a medical certificate of fitness; | ||
| – | Construction Regulations 17(12)(b) | 17 | (12) | (b) | entry | competent in conducting work related to suspended platforms safely; | ||
| – | Construction Regulations 17(12)(c) | 17 | (12) | (c) | opening | trained or received training, which includes at least— | ||
| – | Construction Regulations 17(12)(c)(i) | 17 | (12) | (c) | (i) | entry | how to access and egress the suspended platform safely; | |
| – | Construction Regulations 17(12)(c)(ii) | 17 | (12) | (c) | (ii) | entry | how to correctly operate the controls and safety devices of the equipment; | |
| – | Construction Regulations 17(12)(c)(iii) | 17 | (12) | (c) | (iii) | entry | information on the dangers related to the misuse of safety devices; and | |
| – | Construction Regulations 17(12)(c)(iv) | 17 | (12) | (c) | (iv) | opening | information on the procedures to be followed in the case of— | |
| – | Construction Regulations 17(12)(c)(iv)(aa) | 17 | (12) | (c) | (iv) | (aa) | entry | an emergency |
| – | Construction Regulations 17(12)(c)(iv)(bb) | 17 | (12) | (c) | (iv) | (bb) | entry | the malfunctioning of equipment; and |
| – | Construction Regulations 17(12)(c)(iv)(cc) | 17 | (12) | (c) | (iv) | (cc) | entry | the discovery of a suspected defect in the equipment; and |
| – | Construction Regulations 17(12)(c)(v) | 17 | (12) | (c) | (v) | entry | instructions on the proper use of body harnesses. | |
| – | Construction Regulations 17(13) | 17 | (13) | entry | A contractor must ensure that where the outriggers of a suspended platform are to be moved, only persons trained and under the supervision of the competent person effect such move, within the limitation stipulated in the operational compliance plan contemplated in subregulation (2) (c), and that the supervisor must carry out an inspection and record the result thereof prior to re-use of the suspended platform. | |||
| – | Construction Regulations 17(14) | 17 | (14) | entry | A contractor must ensure that the suspended platform is properly isolated after use at the end of each working day in such a manner that no part of the suspended platform presents a danger to any person thereafter. | |||
| – | Construction Regulations 18(1) | 18 | (1) | opening | A contractor must— | |||
| – | Construction Regulations 18(1)(a) | 18 | (1) | (a) | entry | appoint a competent person in writing as a rope access supervisor with the duty of supervising all rope access work on the site, including the duty of ensuring occupational health and safety compliance in relation to rope access work: | ||
| – | Construction Regulations 18(1)(a) | 18 | (1) | (a) | proviso | Provided that the appointment of any such person does not relieve the construction manager of any personal accountability for failing in his management duties in terms of this regulation; | ||
| – | Construction Regulations 18(1)(b) | 18 | (1) | (b) | entry | ensure that all rope access work on the construction site is carried out under the supervision of a competent person; and | ||
| – | Construction Regulations 18(1)(c) | 18 | (1) | (c) | entry | ensure that all rope access operators are competent and licensed to carry out their work. | ||
| – | Construction Regulations 18(2) | 18 | (2) | opening | No contractor may use or allow the use of rope access work unless— | |||
| – | Construction Regulations 18(2)(a) | 18 | (2) | (a) | entry | the design, selection and use of the equipment and anchors comply with the safety standards incorporated for this purpose into these Regulations under section 44 of the Act; and | ||
| – | Construction Regulations 18(2)(b) | 18 | (2) | (b) | entry | he or she is in possession of a site specific fall protection plan developed by a competent person applicable to the specific work and environment prior to the commencement of the work, including records of maintenance and inspections of all the equipment used for the work operations. | ||
| – | Construction Regulations 18(3) | 18 | (3) | entry | A contractor must ensure that adequate measures are in place to allow rescue procedures to commence immediately in the event of a fall incident taking place. | |||
| – | Construction Regulations 19(1) | 19 | (1) | entry | A contractor must ensure that every material hoist and its tower have been constructed in accordance with the generally accepted technical standards and are strong enough and free from defects. | |||
| – | Construction Regulations 19(2) | 19 | (2) | opening | A contractor must ensure that the tower of every material hoist is— | |||
| – | Construction Regulations 19(2)(a) | 19 | (2) | (a) | entry | erected on firm foundations and secured to the structure or braced by steel wire guy ropes, and extends to a distance above the highest landing to allow a clear and unobstructed space of at least 900 millimetres for over travel; | ||
| – | Construction Regulations 19(2)(b) | 19 | (2) | (b) | entry | enclosed on all sides at the bottom, and at all floors where persons are at risk of being struck by moving parts of the hoist, except on the side or sides giving access to the material hoist, with walls or other effective means to a height of at least 2100 millimetres from the ground or floor level; and | ||
| – | Construction Regulations 19(2)(c) | 19 | (2) | (c) | entry | provided with a door or gate at least 2100 millimetres in height at each landing, and that door or gate must be kept closed except when the platform is at rest at such a landing. | ||
| – | Construction Regulations 19(3) | 19 | (3) | opening | A contractor must cause— | |||
| – | Construction Regulations 19(3)(a) | 19 | (3) | (a) | entry | the platform of every material hoist to be designed in a manner that it safely contains the loads being conveyed and that the combined mass of the platform and the load does not exceed the designed lifting capacity of the hoist; | ||
| – | Construction Regulations 19(3)(b) | 19 | (3) | (b) | entry | the hoisting rope of every material hoist which has a remote winch to be effectively protected from damage by any external cause to the portion of the hoisting rope between the winch and the tower of the hoist; and | ||
| – | Construction Regulations 19(3)(c) | 19 | (3) | (c) | entry | every material hoist to be provided with an efficient brake capable of holding the platform with its maximum load in any position when power is not being supplied to the hoisting machinery. | ||
| – | Construction Regulations 19(4) | 19 | (4) | entry | No contractor may require or permit trucks, barrows or material to be conveyed on the platform of a material hoist and no person may so convey trucks, barrows or material unless those articles are secured or contained in a manner that displacement thereof cannot take place during movement. | |||
| – | Construction Regulations 19(5) | 19 | (5) | entry | A contractor must cause a notice, indicating the maximum mass load which may be carried at any one time and the prohibition of persons from riding on the platform of the material hoist, to be affixed around the base of the tower and at each landing. | |||
| – | Construction Regulations 19(6) | 19 | (6) | entry | A contractor of a material hoist may not require or permit any person to operate a hoist, unless the person is competent in the operation of that hoist. | |||
| – | Construction Regulations 19(7) | 19 | (7) | entry | No contractor may require or permit any person to ride on a material hoist. | |||
| – | Construction Regulations 19(8) | 19 | (8) | opening | A contractor must ensure that every material hoist— | |||
| – | Construction Regulations 19(8)(a) | 19 | (8) | (a) | entry | is inspected on daily basis by a competent person appointed in writing by the contractor and such competent person must have the experience pertaining to the erection and maintenance of material hoists or similar machinery; | ||
| – | Construction Regulations 19(8)(b) | 19 | (8) | (b) | entry | inspection contemplated in paragraph (a), includes the determination of the serviceability of the entire material hoist, including guides, ropes and their connections, drums, sheaves or pulleys and all safety devices; | ||
| – | Construction Regulations 19(8)(c) | 19 | (8) | (c) | entry | inspection results are entered and signed in a record book by a competent person, which book must be kept on the premises for that purpose; | ||
| – | Construction Regulations 19(8)(d) | 19 | (8) | (d) | entry | is properly maintained and the maintenance records in this regard are kept on site. | ||
| – | Construction Regulations 20(1) | 20 | (1) | opening | A contractor must ensure that the operation of a bulk mixing plant is supervised by a competent person who has been appointed in writing and is— | |||
| – | Construction Regulations 20(1)(a) | 20 | (1) | (a) | entry | aware of all the dangers involved in the operation thereof; and | ||
| – | Construction Regulations 20(1)(b) | 20 | (1) | (b) | entry | conversant with the precautionary measures to be taken in the interest of health and safety. | ||
| – | Construction Regulations 20(2) | 20 | (2) | entry | No person supervising or operating a bulk mixing plant may authorize any other person to operate the plant, unless that person is competent to operate a bulk mixing plant. | |||
| – | Construction Regulations 20(3) | 20 | (3) | entry | A contractor must ensure that the placement and erection of a bulk mixing plant complies with the requirements set out by the manufacturer and that such plant is erected as designed. | |||
| – | Construction Regulations 20(4) | 20 | (4) | opening | A contractor must ensure that all devices to start and stop a bulk mixing plant are provided and that those devices are— | |||
| – | Construction Regulations 20(4)(a) | 20 | (4) | (a) | entry | placed in an easily accessible position; and | ||
| – | Construction Regulations 20(4)(b) | 20 | (4) | (b) | entry | constructed in a manner to prevent accidental starting. | ||
| – | Construction Regulations 20(5) | 20 | (5) | entry | A contractor must ensure that the machinery and plant selected is suitable for the mixing task and that all dangerous moving parts of a mixer are placed beyond the reach of persons by means of doors, covers or other similar means. | |||
| – | Construction Regulations 20(6) | 20 | (6) | entry | No person may remove or modify any guard or safety equipment relating to a bulk mixing plant, unless authorized to do so by the appointed person contemplated in subregulation (1). | |||
| – | Construction Regulations 20(7) | 20 | (7) | entry | A contractor must ensure that all precautionary measures stipulated for confined spaces as determined in the General Safety Regulations, 2003, are complied with when entering any silo. | |||
| – | Construction Regulations 20(8) | 20 | (8) | entry | A contractor must ensure that a record is kept of all repairs or maintenance to a bulk mixing plant and that the record is available on site to an inspector, the client, the client’s agent or any employee. | |||
| – | Construction Regulations 21(1) | 21 | (1) | opening | No contractor may use or permit any person to use an explosive actuated fastening device, unless— | |||
| – | Construction Regulations 21(1)(a) | 21 | (1) | (a) | entry | the user is provided with and uses suitable protective equipment; | ||
| – | Construction Regulations 21(1)(b) | 21 | (1) | (b) | entry | the user is trained in the operation, maintenance and use of such a device; | ||
| – | Construction Regulations 21(1)(c) | 21 | (1) | (c) | entry | the explosive actuated fastening device is provided with a protective guard around the muzzle end, which effectively confines any flying fragments or particles; and | ||
| – | Construction Regulations 21(1)(d) | 21 | (1) | (d) | opening | the firing mechanism is so designed that the explosive actuated fastening device, will not function unless— | ||
| – | Construction Regulations 21(1)(d)(i) | 21 | (1) | (d) | (i) | entry | it is held against the surface with a force of at least twice its weight; and | |
| – | Construction Regulations 21(1)(d)(ii) | 21 | (1) | (d) | (ii) | entry | the angle of inclination of the barrel to the work surface is not more than 15 degrees from a right angle. | |
| – | Construction Regulations 21(2) | 21 | (2) | opening | A contractor must ensure that— | |||
| – | Construction Regulations 21(2)(a) | 21 | (2) | (a) | entry | only cartridges suited for the relevant explosive actuated fastening device, and the work to be performed, are used; | ||
| – | Construction Regulations 21(2)(b) | 21 | (2) | (b) | entry | an explosive actuated fastening device is cleaned and examined daily before use and as often as may be necessary for its safe operation by a competent person who has been appointed for that purpose; | ||
| – | Construction Regulations 21(2)(c) | 21 | (2) | (c) | entry | the safety devices of an explosive actuated fastening device are in good working order prior to use; | ||
| – | Construction Regulations 21(2)(d) | 21 | (2) | (d) | entry | when not in use, an explosive actuated fastening device and its cartridges are locked up in a safe place, which is inaccessible to unauthorized persons; | ||
| – | Construction Regulations 21(2)(e) | 21 | (2) | (e) | entry | an explosive actuated fastening device is not stored in a loaded condition; | ||
| – | Construction Regulations 21(2)(f) | 21 | (2) | (f) | entry | a warning notice is displayed in a conspicuous manner in the immediate vicinity wherever an explosive actuated fastening device is used; and | ||
| – | Construction Regulations 21(2)(g) | 21 | (2) | (g) | opening | the issuing and collection of cartridges and nails or studs of an explosive actuated fastening device are— | ||
| – | Construction Regulations 21(2)(g)(i) | 21 | (2) | (g) | (i) | entry | controlled and done in writing by a person having been appointed in writing for that purpose; and | |
| – | Construction Regulations 21(2)(g)(ii) | 21 | (2) | (g) | (ii) | entry | recorded in a register by a competent person and that the recipient has accordingly signed for the receipt thereof as well as the returning of any spent and unspent cartridges. | |
| – | Construction Regulations 22 | 22 | opening | A contractor must, in addition to compliance with the Driven Machinery Regulations, 1988 ensure that where tower cranes are used— | ||||
| – | Construction Regulations 22(a) | 22 | (a) | entry | they are designed and erected under the supervision of a competent person; | |||
| – | Construction Regulations 22(b) | 22 | (b) | entry | a relevant risk assessment and method statement are developed and applied; | |||
| – | Construction Regulations 22(c) | 22 | (c) | entry | the effects of wind forces on the crane are taken into consideration and that a wind speed device is fitted that provides the operator with an audible warning when the wind speed exceeds the design engineer’s specification; | |||
| – | Construction Regulations 22(d) | 22 | (d) | entry | the bases for the tower cranes and tracks for rail-mounted tower cranes are firm, level and secured; | |||
| – | Construction Regulations 22(e) | 22 | (e) | entry | the tower crane operators are competent to carry out the work safely; and | |||
| – | Construction Regulations 22(f) | 22 | (f) | entry | the tower crane operators have a medical certificate of fitness to work in such an environment, issued by an occupational health practitioner in the form of Annexure 3. | |||
| – | Construction Regulations 23(1) | 23 | (1) | opening | A contractor must ensure that all construction vehicles and mobile plant— | |||
| – | Construction Regulations 23(1)(a) | 23 | (1) | (a) | entry | are of an acceptable design and construction; | ||
| – | Construction Regulations 23(1)(b) | 23 | (1) | (b) | entry | are maintained in a good working order; | ||
| – | Construction Regulations 23(1)(c) | 23 | (1) | (c) | entry | are used in accordance with their design and the intention for which they were designed, having due regard to safety and health; | ||
| – | Construction Regulations 23(1)(d) | 23 | (1) | (d) | opening | are operated by a person who— | ||
| – | Construction Regulations 23(1)(d)(i) | 23 | (1) | (d) | (i) | entry | has received appropriate training, is certified competent and in possession of proof of competency and is authorised in writing to operate those construction vehicles and mobile plant; | |
| – | Construction Regulations 23(1)(d)(ii) | 23 | (1) | (d) | (ii) | entry | has a medical certificate of fitness to operate those construction vehicles and mobile plant, issued by an occupational health practitioner in the form of Annexure 3; | |
| – | Construction Regulations 23(1)(e) | 23 | (1) | (e) | entry | have safe and suitable means of access and egress; | ||
| – | Construction Regulations 23(1)(f) | 23 | (1) | (f) | entry | are properly organized and controlled in any work situation by providing adequate signalling or other control arrangements to guard against the dangers relating to the movement of vehicles and plant, in order to ensure their continued safe operation; | ||
| – | Construction Regulations 23(1)(g) | 23 | (1) | (g) | entry | are prevented from falling into excavations, water or any other area lower than the working surface by installing adequate edge protection, which may include guardrails and crash barriers; | ||
| – | Construction Regulations 23(1)(h) | 23 | (1) | (h) | entry | are fitted with structures designed to protect the operator from falling material or from being crushed should the vehicle or mobile plant overturn; | ||
| – | Construction Regulations 23(1)(i) | 23 | (1) | (i) | entry | are equipped with an acoustic warning device which can be activated by the operator; | ||
| – | Construction Regulations 23(1)(j) | 23 | (1) | (j) | entry | are equipped with an automatic acoustic reversing alarm; and | ||
| – | Construction Regulations 23(1)(k) | 23 | (1) | (k) | entry | are inspected by the authorised operator or driver on a daily basis using a relevant checklist prior to use and that the findings of such inspection are recorded in a register kept in the construction vehicle or mobile plant. | ||
| – | Construction Regulations 23(2) | 23 | (2) | opening | A contractor must ensure that— | |||
| – | Construction Regulations 23(2)(a) | 23 | (2) | (a) | entry | no person rides or is required or permitted to ride on a construction vehicle or mobile plant otherwise than in a safe place provided thereon for that purpose; | ||
| – | Construction Regulations 23(2)(b) | 23 | (2) | (b) | entry | every construction site is organized in such a way that, as far as is reasonably practicable, pedestrians and vehicles can move safely and without risks to health; | ||
| – | Construction Regulations 23(2)(c) | 23 | (2) | (c) | entry | the traffic routes are suitable for the persons, construction vehicles or mobile plant using them, are sufficient in number, in suitable positions and of sufficient size; | ||
| – | Construction Regulations 23(2)(d) | 23 | (2) | (d) | entry | every traffic route is, where necessary, indicated by suitable signs; | ||
| – | Construction Regulations 23(2)(e) | 23 | (2) | (e) | entry | all construction vehicles and mobile plant left unattended at night, adjacent to a public road in normal use or adjacent to construction areas where work is in progress, have appropriate lights or reflectors, or barricades equipped with appropriate lights or reflectors, in order to identify the location of the vehicles or plant; | ||
| – | Construction Regulations 23(2)(f) | 23 | (2) | (f) | entry | all construction vehicles or mobile plant when not in use, have buckets, booms or similar appendages, fully lowered or blocked, controls in a neutral position, motors stopped, wheels chocked, brakes set and ignition secured; | ||
| – | Construction Regulations 23(2)(g) | 23 | (2) | (g) | entry | whenever visibility conditions warrant additional lighting, all mobile plant are equipped with at least two headlights and two taillights when in operation; | ||
| – | Construction Regulations 23(2)(h) | 23 | (2) | (h) | entry | tools, material and equipment are secured and separated by means of a physical barrier in order to prevent movement when transported in the same compartment with employees; | ||
| – | Construction Regulations 23(2)(i) | 23 | (2) | (i) | entry | vehicles used to transport employees have seats firmly secured and adequate for the number of employees to be carried; and |