Construction Regulations 6 Duties of designer

21 rows

VerifiedCitationNumberSubsParaSubparaItemRoleText
Subsection (1)
–Construction Regulations 6(1)6(1)opening
The designer of a structure must—
–Construction Regulations 6(1)(a)6(1)(a)entry
ensure that the applicable safety standards incorporated into these Regulations under section 44 of the Act are complied with in the design;
–Construction Regulations 6(1)(b)6(1)(b)entry
take into consideration the health and safety specification submitted by the client;
–Construction Regulations 6(1)(c)6(1)(c)opening
before the contract is put out to tender, make available in a report to the client—
–Construction Regulations 6(1)(c)(i)6(1)(c)(i)entry
all relevant health and safety information about the design of the relevant structure that may affect the pricing of the construction work;
–Construction Regulations 6(1)(c)(ii)6(1)(c)(ii)entry
the geotechnical-science aspects, where appropriate; and
–Construction Regulations 6(1)(c)(iii)6(1)(c)(iii)entry
the loading that the structure is designed to withstand;
–Construction Regulations 6(1)(d)6(1)(d)entry
inform the client in writing of any known or anticipated dangers or hazards relating to the construction work, and make available all relevant information required for the safe execution of the work upon being designed or when the design is subsequently altered;
–Construction Regulations 6(1)(e)6(1)(e)entry
refrain from including anything in the design of the structure necessitating the use of dangerous procedures or materials hazardous to the health and safety of persons, which can be avoided by modifying the design or by substituting materials;
–Construction Regulations 6(1)(f)6(1)(f)entry
take into account the hazards relating to any subsequent maintenance of the relevant structure and must make provision in the design for that work to be performed to minimize the risk;
–Construction Regulations 6(1)(g)6(1)(g)entry
when mandated by the client to do so, carry out the necessary inspections at appropriate stages to verify that the construction of the relevant structure is carried out in accordance with his design:
–Construction Regulations 6(1)(g)6(1)(g)proviso
Provided that if the designer is not so mandated, the client’s appointed agent in this regard is responsible to carry out such inspections;
–Construction Regulations 6(1)(h)6(1)(h)entry
when mandated as contemplated in paragraph (g), stop any contractor from executing any construction work which is not in accordance with the relevant design’s health and safety aspects:
–Construction Regulations 6(1)(h)6(1)(h)proviso
Provided that if the designer is not so mandated, the client’s appointed agent in that regard must stop that contractor from executing that construction work;
–Construction Regulations 6(1)(i)6(1)(i)entry
when mandated as contemplated in paragraph (g), in his or her final inspection of the completed structure in accordance with the National Building Regulations, include the health and safety aspects of the structure as far as reasonably practicable, declare the structure safe for use, and issue a completion certificate to the client and a copy thereof to the contractor; and
–Construction Regulations 6(1)(j)6(1)(j)entry
during the design stage, take cognisance of ergonomic design principles in order to minimize ergonomic related hazards in all phases of the life cycle of a structure.
Subsection (2)
–Construction Regulations 6(2)6(2)opening
The designer of temporary works must ensure that—
–Construction Regulations 6(2)(a)6(2)(a)entry
all temporary works are adequately designed so that it will be capable of supporting all anticipated vertical and lateral loads that may be applied;
–Construction Regulations 6(2)(b)6(2)(b)entry
the designs of temporary works are done with close reference to the structural design drawings issued by the contractor, and in the event of any uncertainty consult the contractor;
–Construction Regulations 6(2)(c)6(2)(c)entry
all drawings and calculations pertaining to the design of temporary works are kept at the office of the temporary works designer and are made available on request by an inspector; and
–Construction Regulations 6(2)(d)6(2)(d)entry
the loads caused by the temporary works and any imposed loads are clearly indicated in the design.