Construction Regulations, 2014 › 19 Material hoists
Construction Regulations 19(3)(a)
| ID | 1225 |
|---|---|
| Citation | Construction Regulations 19(3)(a) |
| Instrument | Construction Regulations, 2014 |
| Instrument type | Regulation |
| Part | — |
| Number | 19 |
| Heading | Material hoists |
| Subsection | (3) |
| Paragraph | (a) |
| Subparagraph | — |
| Item | — |
| Text role | entry |
| Sort key | 06.0019.00070 |
| Source | GNR.84 of 7 February 2014 |
| Amended by | — |
| In force from | 2014-02-07 |
| Status | In force |
| Verified | No |
| Note | — |
| Text | the platform of every material hoist to be designed in a manner that it safely contains the loads being conveyed and that the combined mass of the platform and the load does not exceed the designed lifting capacity of the hoist; |
Sign in to edit this row or mark it verified.